Recently
promulgated stormwater-quality regulations, impacting an estimated
4,000-6,000 communities throughout the United States, are a challenge
to regulators and regulated communities alike.
By Elizabeth Treadway,
Andrew J. Reese, and Douglas C. Noel

The Environmental Protection
Agency (EPA) has published the long-anticipated second phase
of stormwater regulations under the National Pollutant Discharge
Elimination System (NPDES) program, which impacts communities, contractors,
developers, military installations, and other owners and operators
of stormwater systems in urbanized areas throughout the nation.
(Editor’s note: See the "Storm Warning" article in this
issue for the details of Phase II, who it covers, and the six minimum
measures to meet permit requirements.) It had been nine years since
the Phase I rules were published, and several actions in the mid-1990s
set the stage for the finalization of the Phase II program. EPA
established an advisory committee to assist in the drafting of these
rules, having established an interim deadline of August 2001 for
compliance. A couple of years of negotiation and collaboration followed,
with a court order to issue the rules by March 1999, and the publication
of the draft rules occurred in January 1998. As expected, the March
1999 date came and went, with the need to address all comments received
during the public comment period, and Phase II was signed in October
and published in December of last year. (The final rules of Phase
II can be found at EPA’s Web site: www.epa.gov/owm/sw/phase2.)
Program
Impacts
Many small municipal
stormwater management programs have no current components geared
to the management of stormwater runoff quality. Some have pieces
of a program, such as recycling or public education, that were developed
to satisfy other initiatives. Early in the process of implementing
a stormwater-quality management program, a great deal of effort
will be expended in developing the administrative, legal, and technical
framework.
A
best management practices (BMP) program that meets the requirements
of Phase II’s six minimum controls is intended to show measurable
impacts on the quality of receiving waters soon after it is implemented.
Data collection and BMP performance evaluations will be input into
a comprehensive planning process that will result in adjustments
to the permitted community’s stormwater management plan and will
set the priorities for the ongoing program. Through this process
the permittee will eliminate ineffective program elements and implement
those that are effective jurisdictionwide.
In
some instances specific elements of the required stormwater management
program will have a negligible impact on the permittees. For instance,
many states have had land use and technical controls in place in
water-supply watersheds or in the coastal zone for a number of years.
Municipalities in these areas are likely to have strong postconstruction
control programs in place already. In other states there are mandatory
sediment and erosion control programs that are at least as stringent
as the Phase II requirements. These sediment and erosion control
programs can satisfy the Phase II requirements with the approval
of the permit writer.
Flexibility
and Regulatory Planning
Flexibility was identified
as an important factor to be included in this phase of the NPDES
program so that designations for regulatory control could be addressed
without EPA having to name every site for regulation. It creates
an uncertainty, however, while states with delegated authority -
along with EPA - work through the requirements to establish designation
criteria, create regulatory structure, and in some cases obtain
legislative authorizations. The regulations provide permitting authorities
up to three years to meet their obligations to designated permittees,
establish rule structure, identify BMPs, and issue general permits.
Under the schedule for regulatory compliance, even if a permitting
authority takes three years to complete its work, the regulated
community has 90 days to submit an application for a permit or a
Notice of Intent (NOI) to comply with a general permit. Those most
familiar with the planning and budgeting processes of local, state,
and federal governments know that 90 days is not much time to react.
This
first year of implementation is an education, planning, and development
year. EPA is mandated to issue a BMP menu by October 2000 and is
developing guidance for the permit writer as well as for the regulated
community. A periodic review of EPA’s Web site is recommended, as
it expands its resources to educate the impacted entities and guide
the development of the program. There are other resources being
developed to assist as well. States with delegated authority are
working through their plans to incorporate these new rules into
existing regulatory structure. There are states that incorporated
into their own rule structure the federal rules, by a broad reference
to 40 CFR Parts 122 and 123, when the Phase I program was created.
This action minimizes the need to create new rules each time an
amendment occurs, unless it is necessary to address some specific
condition or action. Many states, however, must obtain changes in
legislative authority to establish the Phase II program.
Within
the rules is an opportunity to address the Phase II initiative within
a comprehensive water-quality strategy. The rules allow for acknowledgement
of compliance with existing programs, such as erosion control activities,
so that duplicate or significantly overlapping programs will not
be required. They give permitting agencies the flexibility to develop
permits on a watershed basis, providing additional time for full
compliance with the program. The challenge for the permitting agencies
is to craft a permit that addresses the pollutant contributions
from stormwater while recognizing other water-quality initiatives
within the individual state. When this approach is considered, the
three-year window for establishing Phase II regulatory structure
is limiting.
North
Carolina's Approach to Integrated Water-Quality Management
In March, the Environmental
Management Commission and the Department of Environment and Natural
Resources initiated a planning effort to integrate stormwater programs
into a comprehensive vision focused on improving and protecting
the water resources within the state of North Carolina. Recognizing
that this is a significant task, the Division of Stormwater Quality
developed a strategy that provides facilitated stakeholder input
based on Enlibra, a shared doctrine for environmental management
established by the National Governors’ Association (NGA). This doctrine
defines a series of interdependent principles that guide natural
resource and environmental policy. North Carolina’s Governor James
Hunt supports the initiative underway to create an integrated stormwater
program using this approach.
According
to the policy statement of the NGA, Enlibra
is based on eight principles that are critical to the success of
any new program:
- National Standards,
Neighborhood Solutions. Assign responsibility at the right
level.
- Collaboration,
Not Polarization. Use collaborative processes to break down
barriers and find solutions.
- Reward Results,
Not Programs. Move to a performance-based system.
- Science for Facts,
Process for Priorities. Separate subjective choices from objective
data gathering.
- Markets Before
Mandates. Replace command and control with economic incentives
whenever appropriate.
- Change a Heart,
Change a Nation. Ensure environmental understanding.
- Recognition of
Benefits and Costs. Make sure environmental decision-makers
are fully informed.
- Solutions Transcend
Political Boundaries. Use appropriate geographic boundaries
for environmental problems.
currently within North
Carolina, there are multiple layers of regulation for stormwater
and related programs that address:
- water-supply watershed
protection,
- coastal-region development
controls,
- a nutrient-sensitive
waters (NSW) strategy for the Neuse River,
- a NSW strategy that
is in draft (due for finalization this year) for the Tar-Pamlico
River Basin for nitrogen and phosphorus,
- NPDES industrial stormwater
requirements,
- NPDES Phase I and
Phase II stormwater requirements,
- sedimentation and
erosion control regulations,
- various river-basin
management strategies for all basins.
The plan is to engage
the stakeholders in a six-month
collaborative process
with the goal of drafting a comprehensive, statewide stormwater
management program that will address the integration of specific
controls and program elements for conditions that vary across the
state. The challenge before the stakeholders is to reach consensus
on programmatic elements that will address the unique needs across
the state in a logical and cost-effective manner.
Understanding
the varied nature of the environment in which the water-quality
program must exist is important to the process. North Carolina has
varied geographic conditions. From the western region within the
Appalachian Mountains to the coastal plains with the outer banks,
it is a mix of geology, weather, and population densities. Receiving
waters vary from pristine, high-quality, wild rivers to heavily
impacted, industrialized ports. It is a state with significant rural
agricultural activities, a fishing industry, and large metropolitan
centers. Tourism is an important economic base tied to the water
resources of the coastal region as well as the mountainous Piedmont
region. Improving and protecting water is a high priority within
the state, as demonstrated by the recent voter-approved state bond
program of $1 billion.
The
stakeholders will be challenged to balance the needs of potentially
conflicting interests to ensure that the overall vision for protection
of important resource waters is met. If you are interested in learning
more about the North Carolina experience, contact Susan Massengale,
DENR, Division of Water Quality at 919/733-5083 or
susan.massengale@ncmail.net.
Training
on Phase II Requirements
This is a year for training,
and many opportunities are being provided. For those who are interested
in training activities, check out EPA’s Web site as well as the
sites for organizations that represent impacted entities such as
the National League of Cities (www.ncl.org),
the National Association of Counties (www.naco.org),
the American Public Works Association (www.apwa.org),
and the National Association of Flood and Stormwater Management
Agencies (www.nafsma.org).
Local chapters are usually involved in providing training opportunities.
Contact your permitting agency for additional information on its
planning efforts and schedule for implementation.
Planning
Ahead
There are steps that
a local government should take now to prepare itself for the regulations
and to position itself to meet compliance in the most cost-effective
manner. These steps can be performed by the municipality’s designated
program manager as part of a Phase II action plan:
- Assess Your Status.
Ask yourself if your municipality is "in," "potentially
in," or "out."
- Get to Know the
Permit Writers. Find out what the expectations of the
permit writers are for your compliance program. Find out their
ideas about what is important in the permit, what their special
interests are, if they strongly support the permit, and so on.
Plan to establish an ongoing dialogue.
- Assess Your Surface
Waters. Find out if there are any ongoing actions that
might designate surface waters in your jurisdiction as not meeting
water-quality standards. See if there are any planned watershed
assessments or total maximum daily load requirements coming in
the future.
- Assess Your Own
Program. How much of your stormwater program looks
like the regulations, even with some minor modifications? What
can you take credit for that you are already doing, with or without
modification?
- Check Out Your
Neighbors. Are there some other programs nearby that might
result in savings to you? Can you simply be covered under another
program? Can parts of the requirements be waived because they
are already being done by someone else? Can you plan to be part
of a regional permit? Can you split the permit requirements with
an adjacent entity and perform them together at savings to both
of you?
- Get a Team Together.
Once you have answered some of these questions, it is
time to pull the action team together. This may include your own
staff, a multidisciplinary staff within your own jurisdiction,
or a multijurisdictional or regional team. Get together to brainstorm
and come up with a proposal to the permit writer for mutual benefit.
Remember, permit writers are being encouraged by EPA to think
regionally and on a watershed basis.
- Develop an Action
Plan. Once you have a team, it is time to have a plan.
Formulate what you will need to do to apply for the permit and
carry it out. What might a stormwater program that meets the requirements
for the six minimum controls look like in your community? Can
you begin the program transformation process now? Are there some
things you can do over several years that you cannot afford to
do in any one year or that will take too long to get going if
you wait until the permit is upon you? What about data collection
and mapping? Are there other uses for any data you will collect
that will create synergy?
- Get Started.
Some things are best started early. But do not jump the
gun by committing resources in areas that are not yet firm. Ask
the permit writer for his or her opinion. If you determine that
you will need help in applying for the permit or defining a stormwater
management program that satisfies the six minimum controls, line
it up soon. With 4,000 communities preparing NOIs or applications
in two years it may be difficult to find qualified outside help
at the last minute.
Elizabeth
Treadway is senior consultant; Andrew J. Reese, P.E., is vice president;
and Douglas C. Noel, P.E., is national technical director at Ogden
Environmental and Engineering Services Inc. in Greensboro, NC.
|